Thursday, 21 May 2009

Donor parts arrive

My donor sierra rear end turned up yesterday along with the rest of the suspension pack from Tiger (ball joints, track rod ends etc). I managed to strip down the rear end in the afternoon and put a few coats of paint on today. The rear end was in pretty good nick and the bolts were easy to get off. I took the drum off first, then took the 4 bolts holding the back plate to the hub off, the drive shaft slid out and then I removed the diff. Happy days.

I started to rub down the drive shafts and diff lastnight, and finished them off this morning. Managed to get a few coats of primer on this afternoon and one coat of black on this evening. Will finish them both off tomorrow. The drums are shoes are in good condition as they have not long been taken off a Tiger. Will be ordering the diff bolts from ford soon so I can get that fitted and sort out the back end. Also have all of the suspension and steering to get on with so should be busy over the next month or so.

Heres some photos of the donor parts...


The rear end on the pallet

The drums (might purchase new cylinders)

The drive shafts and hubs


Few coats of silver on the diff

Sunday, 10 May 2009

Just like christmas!!

The steering and suspension pack arrived Friday, was just like christmas in my garage. Havent had chance to get stuck into it yet though. I stripped down the old cortina hubs and brakes. Took some time to get the bolts loose, went through plenty of WD40. They have been sent away now to be blasted and sprayed and should be back within a week. Will have to find some time in the week to start on the rear suspension. Off to halfrauds today to get a c-spanner for the shocks. Few photos below of the parts...





Old cortina units



Stripped down and ready for blasting




Managed to get my hands on the chassis bungs and fit them

Next post should be the rear suspension fitted

Tuesday, 5 May 2009

Small update

Just a small update on the build......I am still waiting for the suspension and steering pack from Tiger so havent done anything in the garage apart from have a little clear out. Am hoping the parts will be here this week so I could make a start on Friday.

Monday, 27 April 2009

Fuel lines in

Just a small update about the fuel lines. At first I was going to run 8mm feed and 6mm return lines but was advised by tiger owners to run both lines at 8mm. I popped down a local plumbing shop and picked ut a few metres (only 90p per metre). I decided to to run the fuel lines at the bottom of the tunnel saving the top for the wiring loom. The 8mm pipe was fairly easy to bend but had to watch out for the pipe collapsing unlike the brake pipe. Before I clipped it to the chassis I wrapped spiral wrap around the fuel lines just incase over time they moved and rub on the chassis (also did the brake pipe while I was at it). I used 8mm nylon p-clips along the tunnel and then rubber lined s/steel p-clips at the rear end where I felt more support was needed. When both pipes were finished I was suprised how stiff and secure they ended up.

First fuel pipe done

Both secured



Next job is the suspension and steering. Just waiting for the parts from Tiger. Fingers crossed they wont take long.

Tuesday, 14 April 2009

Brakes lines done

Managed to get some time together to finish the brake lines. I used the ready made up automec brake line kit from tiger. Whilst looking at other people builds I noticed that not all people used a brake compensator, but used some sort of adjustable brake bias valve. I decided to go with the idea and purchased a tilton adjustable valve. Not sure how I'm going to lock it off yet for the IVA test.

Took me a while to figure out which route would be best for the brake lines at the front. Hopefully the route I used will be fine. I simply bent the copper pipe by hand around the chassis and used the automec brake clips to secure it. These clips where perfect for the job and real simple to put it. Just drilled a 6mm hole, pushed the plug into it, then the clip itself into the plug. They give a real secure hold of the brake pipe, would recommend these to all builders.

Below are some photo's of the build so far. Will be popping up to Tiger soon to pick up the suspension, steering and fuel tank etc.








Friday, 27 March 2009

Panels all fitted

Finally finished all of the panels for now. I've left the battery tray and top tunnel panel till later for easy access. Had to make a few extra ally plates on the tunnel panels as the ally sheets from tiger were slightly too short. No big deal though. Sealed it all up this afternoon and mounted the brake pedal bracket to the floor.

I had a problem with the pedals back plate which the master cylinder bolts to. It is slightly too narrow to fit four bolts through so I have put 2 through for now and will get it welded in a week or two for extra strength, hence why the driver footwell panel has to cut-outs on it. A few photo's below of the panels finished and sealed.


Panels all finished



Holes for the master cylinder



Sealant applied

Drivers footwell panel with cutouts for the back plate to be welded to the chassis

All sealed and brake pedal bracket bolted on
Next job will be to weld the back plate to the chassis for the master cylinder and get the brake lines in.

Sunday, 15 March 2009

Need more hours in the day

I haven't had as much time as I would of liked over the last week or so in the garage but am pleased with the work I have managed to get through. After finishing the floor panels I decided to do the back panel and side panels. The back panel wasnt as difficult as first thought but marking the centre the of the chassis members on the panel was. I deicded to rivet the panel to the diagonal supports as well as the straight chassis members for additional hold even though it did take a lot longer. I got the side panels out of the way pretty quick and cut the sheets ready to rivet the central tunnel.


2 panels down, 12 to go

Back panel being marked up

Back and side panels complete

Tunnel panels layed up

Next stage is to try and finish off the panels this week and think about the floor mounted pedals and brake lines etc.