I removed the lower rear wishbones and adjusted the rose joints for the geometry to be correct. I then tightened all the nust and bolts up (not fully, this will be done when the car is on its wheels). The drum backing plates had been painted over christmas so i decided to fit them and the driveshafts. This ran into a problem I was not aware of. The backing plates do not sit flush with the Avon's rear hub carriers. A quick call to Tiger and I was informed that an angle grinder was needed to grind away the high spots on the backing plate. An hour later the backing plates were sitting flush and the drive shafts were bolted in. I used 3 x 40mm M10 and 1 x 25mm M10 for each side. The 25mm bolt is needed because one of the holes in the hub carrier is shallow.
The final little job was to bolt the handbrake handle in and cut & fit the top panel of the tunnel. I wanted this top panel to be easy to remove so decided to use M4 rivnuts. This saves drilling out rivets if it needs to be removed. Then it was a matter of marking the cut-out for the handbrake handle and cutting it out.
I am waiting for my willwood brake kit to come for the front so I can finally get that sorted. I am taking a trip up to Tiger at the end of the month for a load of parts. Mainly the bodywork, fuel tank, steering column etc. I have seen the wheels I want and also the seats. These will hopefully be ordered this month. So next job is to finish the front brakes and steering off. Heres a few photo's of it so far.
No comments:
Post a Comment